庙沟铁矿二期尾矿库坝体存在问题及治理  

Problems and their solutions of Phase-Ⅱ tailings dam in Miaogou Iron Ore Mine

在线阅读下载全文

作  者:马选林[1] 

机构地区:[1]河北钢铁集团矿业有限公司庙沟铁矿,河北秦皇岛066501

出  处:《矿业工程》2009年第5期42-43,共2页Mining Engineering

摘  要:针对庙沟铁矿二期尾矿库子坝在雨季出现大面积流砂冲沟等影响坝体整体稳定性的具体问题进行深入分析,并结合沉降、滑塌和渗流等影响坝体整体稳定性的不安全因素,提出加强坝体位移观测、修筑并维护排水沟、进行库区绿化和加强安全管理等一系列治理方案。In rain seasons rainwater often causes big--sized trenches on Phase--II tailings dam top and slope surface that influences integrated stability of dam. This problem is analyzed in details. On the basis of analyzing factors such as settlement, collapse and leakage that damage the stability of dam, a series of measures including surveying of dam body shift, digging and maintaining of drainage trenches, green making of dam area, enhancing of safety management are recommended to keep safety of dam.

关 键 词:尾矿库 存在问题 治理措施 

分 类 号:X45[环境科学与工程—灾害防治]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象