检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]大连理工大学土木水利学院,辽宁大连116024
出 处:《水力发电》2009年第8期10-12,39,共4页Water Power
基 金:国家"十一五"科技支撑项目(2006BAB14B05);国家自然科学基金项目(50809011)
摘 要:参照流域暴雨与径流相关的特点,以实际的旬初土壤蓄水量、旬降雨量为输入条件,以实际的旬径流量为输出条件,建立BP神经网络旬降雨径流相关模型。实例表明,模型结构简单,可操作性强,利用该模型进行的旬径流预报具有较好的模拟精度,并为利用旬降雨预报信息实施旬径流中期预报奠定了基础。The ten-day correlation forecast model of rainfall and runoff based on BP neural network was established by taking actual initial soil water content and ten-clay rainfall as its inputs and the actual ten-day runoff as its output, according to the watershed characteristics of rainfall and runoff correlation. The example results showed that this model is simple in structure and easy to operation, and its ten-day runoff forecast has good simulation precision. This model laid a foundation for the ten-day runoff forecast by using ten-day rainfall forecast information.
关 键 词:降雨径流预报模型 旬径流 旬初土壤蓄水量 旬降雨 BP神经网络
分 类 号:TV121.1[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.62