三峡船闸完建期156m蓄水位4级运行方式原型调试研究  被引量:3

Study on four-step operational mode prototype debugging of TGP lock under impounded level 156 m in the finishing construction period

在线阅读下载全文

作  者:胡亚安[1] 张瑞凯[1] 李云[1] 

机构地区:[1]南京水利科学研究院,南京210029

出  处:《中国工程科学》2009年第9期52-58,共7页Strategic Study of CAE

摘  要:从水力学条件论证了船闸采用4级运行方案的可行性。通过原型调试,采取中间及阐首优化后的输水方式运行,基本消除了闸室第一分流口空化,船闸在超过设计的45.2 m水头下工作条件较好,在三峡船闸完建期156 m蓄水位船闸采用4级运行方式具优越性。This paper expounds the superiority of adopting four-step operational mode for TGP lock under impounded level 156 m in the finishing construction period, and demonstrates the feasibility of adopting four-step operational mode with the hydraulic conditions. After adopting the optimizing water conveyance pattern by means of prototype debug, the cavitation of the 1^st-bifurcation at mid chamber has been basically eliminated, the working conditions of the lock under exceeding design water head 45.2 m has been confirmed well, therefore, the four-step operational mode can be adopted for TGP lock.

关 键 词:三峡船闸 运行方式 原型调试 

分 类 号:U641[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象