检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长沙理工大学土木与建筑学院,湖南长沙410076 [2]宁波市杭州湾大桥发展有限公司,浙江宁波315327
出 处:《山东交通学院学报》2009年第3期53-57,62,共6页Journal of Shandong Jiaotong University
摘 要:以某高桩跨海大桥为背景,介绍了风荷载的计算方法,并对最大双悬臂状态的风载内力、静风稳定性及颤振稳定性进行了验算。验算结果表明:风荷载的大小及作用方式对主梁、主墩及桩基强度和位移影响比较大;风荷载的加载方式对桥梁的稳定性影响较小,对结构稳定性起主要作用的是恒载、施工荷载。With a high rise pile sea-cross bridge as an example, the paper introduces the methods of calculating wind load and checks the aerostatic wind stability, internal forces of the wind load and the flutter in the maximum double cantilever stage. The calculation indicates that the strength and function mode have more influence on the main girder, main frusta, pile strength and placement; wind loading mode has less influence on the stability of the bridge; the main factors that control the structure stability are constant load and construction load.
关 键 词:高桩承台 连续刚构桥 最大双悬臂 阵风荷载 颤振 静风稳定性
分 类 号:U448.23[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28