只具有设计能力工程总承包商的纵向一体化研究  

Study on the Vertical Integration of General Contractors That Only Have Designing Ability

在线阅读下载全文

作  者:管百海[1,2] 

机构地区:[1]西南交通大学经济管理学院,成都610031 [2]中铁八局第二产业部,成都610036

出  处:《工程建设与设计》2009年第11期143-147,共5页Construction & Design for Engineering

基  金:教育部高等学校博士点专项基金资助项目。(20060613019)

摘  要:只具有设计能力的工程总承包商要实施工程总承包项目,对自己目前缺乏能力完成的施工工作必须决策是分包给施工企业还是培育自身的施工能力。作者根据建筑业上下游企业之间的关系,建立了一体化和非一体化两种情况下行业和总承包商的成本模型,得出了行业和总承包商进行纵向一体化的影响因素和条件,并就建筑施工市场的竞争激烈程度对总承包商一体化决策的影响进行了分析,最后以具体的数据作为算例对研究所得到的结论进行了验证。The engineering company that only has de signing ability wants to do D-B jobs, has to decide how to do the works they can't do: use subcontractor, or cultivate their own building ability by vertical integration and then do everything in D-B projects. This paper sets up the cost models of construction industry and general contractor under the two conditions of vertical integration and non-integration. It discovers the condition that general contractor should vertical integrate and the effect factors. Then it analyses how the competing degree of building market affect the general contractor's integration decision. In the end, the outcomes are proved by variational data.

关 键 词:设计 单一能力 总承包商 施工分包 纵向一体化 

分 类 号:F062.4[经济管理—政治经济学] F284

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象