千枚岩采场支护结构相似模拟试验研究  被引量:5

Similar Simulation on Support Structure of Stope in Phyllite Ground

在线阅读下载全文

作  者:支学艺[1] 赵奎[1] 张理[2] 许振华[1] 王晓军[1] 

机构地区:[1]江西理工大学资源与环境工程学院,江西赣州市341000 [2]江西铜业公司银山铅锌矿,江西德兴市334201

出  处:《矿业研究与开发》2009年第5期10-13,共4页Mining Research and Development

摘  要:针对千枚岩采场围岩严重片帮问题,建立相似材料模型,对千枚岩采场稳定性进行模拟。模拟试验结果表明,预留原生点柱可以有效降低采场中部拉应力。回采过程中,在距底柱16m和28m处保留原生点柱对采场围岩进行支护,在很大程度上改善了地压作用对采矿作业造成的危害。研究表明矿柱断面为4m×4m是合理的,预留矿柱的矿量远远小于因上采高度增加而多回采的矿量,且大大提高了矿石的回采率。该模拟结果在实际应用中已经取得了良好的效果。The surrounding rock of stope in phyllite ground spalled seriously at some mine, so a similar material model were set up to simulate the stability of stope. The simulated results indicated that reserved ore pillars can disperse the tension stress in the middle of the stope. During the course of stoping reserved ore pillars up to 16 m and 28 m from the floor can reduce the danger caused by ground pressure to mining operations. The 4 m × 4 m section of reserved ore pillar is enough and the recovery ratio of ore is enhanced because the quantity of reserved ore pillars is much smaller than quantity of ore mined for increased mining height. The results of the research have made good effect in practice.

关 键 词:千枚岩 采场支护 相似模拟 矿柱 

分 类 号:TD352[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象