检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林国雄[1] 方秦汉[1] 秦顺全[1] 屈匡时[1]
机构地区:[1]铁道部大桥局
出 处:《桥梁建设》1998年第4期1-8,共8页Bridge Construction
摘 要:芜湖长江大桥是国内首次采用板桁结构建造的一座公、铁两用桥梁。铁路桥全长为10521m,公路桥全长为5681m。正桥主航道采用主跨312m、低塔、斜拉索加劲的连续钢桁梁结构,主桁为N型桁架,公路路面采用预制混凝土桥面板。副航道为主跨144m的连续钢桁梁,主桁为无竖杆三角形桁架。本桥设计中采用了一系列新材料、新结构和新工艺。针对本桥设计和荷载、刚度、焊接及板桁结构等关键技术问题的研究论证作了简要介绍。The Wuhu Changjiang Bridge is a railway highway combined bridge in which plate truss structure is first adopted in China.Total length of railway bridge is 10 521 m and that of highway bridge is 5 681 m.The main channel of bridge proper is a cable stayed bridge of low tower,stiffening continuous steel truss beam structure which main span is 312 m and the main truss is a N type truss.The highway surface is a precast concrete bridge deck.Auxiliary channel is a continuous steel truss beam with 144 m main span,the main truss is a triangle truss without vertical post.In design of this bridge,a series of new materials,new structures and new technology were adopted.The design and research of key technical problems such as load,rigidity,welding and plate truss structure about this bridge are briefly introduced.
分 类 号:U442.54[建筑科学—桥梁与隧道工程] U448.27[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.157