检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:倪镭[1] 孟毓 杨文威[3] 张永隆[1] 夏再忠[4]
机构地区:[1]上海市电力公司,上海200122 [2]上海电力设计院有限公司,上海200025 [3]上海市电力公司电网建设公司,上海200002 [4]上海交通大学,上海200030
出 处:《华东电力》2009年第11期1886-1890,共5页East China Electric Power
摘 要:通过数值模型对隧道内的电缆发热对隧道的热场进行模拟计算分析,得到了隧道热场受负荷、隧道直径、深度等因素的影响关系,并采用了缩小比例试验及现场验证手段对模型准确性进行了验证。对正在建设中的500 kV世博隧道的热场进行了预测,并提出了降低隧道温度的措施及效果分析。The cable tunnel is now widely used in Shanghai,and the study of its thermal field is considered important to scientific selection of the parameters of the tunnel and the cable,and the cooling methods for the cable.By using numerical models,the influence of cable heating on the thermal field of the tunnel was analyzed,and consequently the relationship between the thermal field and factors of load and the tunnel′s width and depth was obtained.Then the model was verified by a small-scale experiment and field tests. The model was used to predict the thermal field of 500 kV Shibo Tunnel in operation, and suggestions on tunnel temperature reduction were proposed, and the outcomes were analyzed.
分 类 号:TM726.4[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117