济钢重点工程项目设备供期及质量管控  

Management and Control of the Supply Period and Quantity of the Equipment for Jinan Steel's Major Project

在线阅读下载全文

作  者:盛桂军[1] 唐贤军[1] 李文利[1] 许文[1] 

机构地区:[1]济南钢铁股份有限公司装备部,山东济南250101

出  处:《山东冶金》2009年第6期70-72,共3页Shandong Metallurgy

摘  要:根据济钢工程建设项目设备采购管理的要求,通过对生产准备、设备制造、设备交货3个阶段交货期的严格管理,加强设备采购质量事前、事中和事后的全过程控制,促进了设备采购管理水平的持续提高,达到了加快工程项目建设的目的,确保项目按期投产达效。According to purchasing management requirements of the equipment for Jinan Steel' s major project, through the strict management for three stages, that is, the production preparation, the equipment manufacturing and the equipment delivery, and strengthening the entire process control of quantity in advance, during and afterwards, the management level of equipment purchasing was improved continually, reaching the aims to speed up construction projects and ensuring the project put into production on schedule over effect.

关 键 词:设备 采购管理 供货期 质量 

分 类 号:F274[经济管理—企业管理]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象