检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《中国安全生产科学技术》2009年第6期57-61,共5页Journal of Safety Science and Technology
基 金:国家"十一五"科技支撑计划项目(编号:2008BAB29B06);中国安全生产科学研究院基本科研业务费专项资金项目(编号:2009JBKY04)
摘 要:隧道施工破坏了原有的岩体平衡,可能引发塌方、突水等安全问题,为了评估隧道建设的安全性,基于三维稳定渗流问题的基本控制方程,对铜锣山隧道全线的开挖和支护方案进行了三维流固耦合模拟,在应力、应变、渗流分析的基础上,评估了隧道建设发生岩爆、坍塌、突水灾害的风险,预测了可能出现大变形和突水灾害的工段,对于隧道安全建设具有指导意义。Tunnelling may disturb the intrinsic balance of the stratum, and result in accidents like caving or gushing. In order to access the security of the Tong-Luo Shan tunnel project, 3D fluid-solid coupling numerical simulation, based on the basic control equation of 3 D steady flow, was used to calculate the stress, strain and flow vector, according to the design of excavation and support of the whole tunnel. The result shows the risk level of rockburst, caving and gushing of the tunnel construction, and some areas with large distortion or gushing disaster were forecasted, thus may be significative for the safety of the project.
分 类 号:X936[环境科学与工程—安全科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117