检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]东南大学自动化学院复杂工程系统测量与控制教育部重点实验室,江苏南京210096
出 处:《计算机集成制造系统》2009年第12期2350-2355,2362,共7页Computer Integrated Manufacturing Systems
基 金:国家863/CIMS主题资助项目(2007AA04Z112);国家自然科学基金资助项目(50875046)~~
摘 要:针对混流装配线的负荷均衡化问题,建立了最优化辅助工人数量的一类新的排产优化模型,分析了混流装配线的空间间隔约束和能力约束之间的关系,证明了空间间隔约束是满足工作站能力约束的充分条件。在此基础上给出了有辅助工人参与情况下的空间间隔约束不等式。对一些非线性约束进行了线性化处理,从而可以方便地求解模型。最后,通过仿真实例验证了该方法的可行性和有效性。To balance the workload on a mixed-model assembly line,a novel sequencing model to minimize the number of utility workers was established,the relationship between the space constraints and capacity constraints was analyzed.The space constraints were proved to be a sufficient condition for the capacity constraints.Based on these analyses,the space constraint inequalities with utility workers were presented.To conveniently solve the model,some nonlinear constraints were transformed into linear constraints.Simulation results confirmed the feasibility and validity of this proposed method.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117