检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:付国栋[1] 王瑞骏[1] 赵一新[2] 张葛[1]
机构地区:[1]西安理工大学水利水电学院,陕西西安710048 [2]四川省清源工程咨询有限公司,四川成都610000
出 处:《水资源与水工程学报》2009年第6期116-119,共4页Journal of Water Resources and Water Engineering
摘 要:以某已建工程为例,基于非线性邓肯E-B本构模型,建立了施工期坝面过水面板堆石坝的有限元模型,探讨了施工期坝面过水面板堆石坝的应力变形的分布与变化规律。计算结果表明:坝体应力变形主要是由自重引起的,汛期坝面过水引起的坝体附加应力变形较小,其结果都在合理的范围之内,面板堆石坝汛期采用坝面过水度汛是安全可靠的。Taking one built project for example, the article established a finite element model tor overflow rockfill dam in construction period based on the nonlinear Dengken E--B constitutive model and discussed the distribution of stress-deformation and charge regularities of the overflow rockfiU dam. The result indicated that the stress deformation of dam mostly was caused by deadweight, annex stress and strain of dam caused by the water upon CFRD was less in flood season, the result was reasonable, it was safe and reliable that flowing water through dam surface of CFRD in the flood season.
分 类 号:TV641.45[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.76