检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李英勇[1,2] 张顶立[1] 张宏博[3] 宋修广[3]
机构地区:[1]北京交通大学土建学院,北京100044 [2]山东省交通厅公路局,济南250002 [3]山东大学土建与水利学院,济南250061
出 处:《岩土力学》2010年第1期144-150,157,共8页Rock and Soil Mechanics
摘 要:预应力锚索已广泛应用于边坡加固工程中,由于其承受高拉应力作用,并长期埋置于潮湿的岩土环境中,在综合因素的作用下存在失效的可能性。结合实体工程中的大量监测数据,对预应力锚固系统长期稳定性的影响因素进行了深入分析,提出了预应力锚固系统的失效机制;为了分析锚索失效效应,确定合理的处理时机,分别进行了现场卸载试验及数值模拟,研究了单锚及群锚失效效应,提出了边坡局部失稳的判据,其结果可为类似工程提供借鉴。Although prestressed anchor cables have been used to reinforce slopes widely, they can happen to fail at some time because they have bear high-tension stress in moist environment and been influenced greatly by many external factors. In order to make sure of failure effects of anchorage system well, failure mechanisms are put forward firstly according to monitor data of an actual slope engineering. Then, unloading test of a cable at site was performed to get the influence on tension-force of neighboring cables. By adopting the numerical simulation, the influence on anchorage force of neighboring cables and stability of slope because of cable failure is analyzed in detail. Finally, failure criterion for part slope is put forward.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30