地铁车站后期工程实施对既有车站的影响研究  

Study on Effects of Later Stage of Metro Station Project on Existing Stations

在线阅读下载全文

作  者:高志宏[1] 

机构地区:[1]中铁第一勘察设计院集团有限公司城建院,高级工程师西安710043

出  处:《现代城市轨道交通》2010年第1期31-33,36,共4页Modern Urban Transit

摘  要:以分析基坑开挖引起紧邻车站变形为切入点,对北京地铁宋家庄枢纽站的后期工程基坑开挖进行数值分析,研究了不同施工方案下既有宋家庄车站结构的变形情况,分析了后期工程实施过程中存在的典型风险源,并提出了相应的工程对策。Taking the analysis on distortion of near station caused by foundation pit excavation as the breakthrough point, the numerical analysis on foundation pit excavation in the later stage of Songjiazhuang Station project of Beijing Metro is carried out. The distortion conditions of the structure of existing Songjiazhuang Station under different construction schemes are investigated. The typical risk sources existing during the later project implementation are analyzed. The corresponding engineering countermeasures are presented.

关 键 词:地铁 紧邻基坑 后期施工 风险 数值模拟 影响分析 

分 类 号:U231.4[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象