检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《哈尔滨商业大学学报(社会科学版)》2010年第1期53-57,共5页Journal of Harbin University of Commerce:Social Science Edition
摘 要:竣工结算审核是合理确定工程造价的必要程序和手段,在竣工结算阶段具有重要意义。通过对工程量清单计价模式下的竣工结算审核进行了比较系统的研究,分析了其在竣工结算过程中所存在的问题,提出了相应的对策。Completion settlement verification is an essential procedure and method for confirming engineering cost reasonably. It has an important meaning in completion settlement stage. This paper studies the completion settlement verification systematically based on the bill - of - quantity model, and analyzes problems and mistakes which does exist in completion settlement stage. Finally, corresponding countermeasures and suggestions are proposed to against the problems above.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.48