检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华北电力大学能源与电力经济咨询中心,北京102206 [2]南京财经大学经管学院,南京210046
出 处:《华东电力》2010年第1期31-33,共3页East China Electric Power
基 金:国家自然科学基金项目(70671041)
摘 要:在保证电网火电总负荷不变及火力发电量总量不变的情况下,根据节能调度基本思想,以能耗最低为约束目标,重新分配各火电机组负荷,并在合理范围内调整各机组利用小时数,从而改变各机组发电量。通过模拟在不同负荷水平下的机组单位煤耗,以及在计划调度与节能调度下的各机组发电量,分别计算出各机组总的煤耗水平。通过比较两种调度方式下,总的煤耗及污染物排放变化情况,分析节能调度的节能减排效果。Under the circumstance of ensuring the total load and total electricity generation of thermal power plants in the grid unchanged, the loads for each unit were redistributed and the utilization hours of each unit were adjusted within a reasonable range with the aim at the minimum coal consumption according to the principle of energy-saving dispatching. As a result the electricity generation from each unit was changed. The total coal consumption of each unit was calculated respectively through simulating its coal consumption under different load levels and calculating its electricity generation under both the planned dispatching and the energy-saving dispatching. Consequently, the effect of energy-saving dispatching on energy saving and emission reduction was analyzed by comparing the variations of total coal consumption and pollutant emissions between the two dispatching methods.
分 类 号:TM73[电气工程—电力系统及自动化] F407.61[经济管理—产业经济]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30