检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《重庆交通大学学报(自然科学版)》2010年第1期42-44,89,共4页Journal of Chongqing Jiaotong University(Natural Science)
摘 要:非节点连接方法为加筋结构提供了筋与混凝土可完全独立的单元建模方案,允许筋单元与混凝土单元交错划分。针对该方法中筋单元跨越多个混凝土单元的情况,分析了钢筋单元与混凝土单元面的交点位置关系及其影响效果,建立了在混凝土单元交界面划分筋单元节点的数学模型,解决了钢筋单元与混凝土单元的位移协调问题,通过算例演示了本文方法的可行性和有效性。The non-node connectivity method provides a completely independent element modeling program for steel and concrete in reinforced structure, it allows steel element and concrete element division staggered. To the issue of steel ele- ment crossing through the concrete element in this method, the intersection location relationship between steel element and concrete element surfacse and its effect are analyzed. The mathematics model which devides the nodes of steel elements at the intersection of concrete element interfaces is established; meanwhile, the problem of coordinating the displacement be- tween the steel element and concrete element is solved. The feasibility and effectiveness of this method is demonstrated by case study.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28