煤矿列车煤量自动增补系统研制  被引量:3

Study and Development of Auto Balance System of Coal Quantity for Coal Car

在线阅读下载全文

作  者:席启明[1] 刘冲[1] 齐玫[1] 臧梦[1] 王战洲[2] 吕成斌 

机构地区:[1]煤炭科学研究总院北京高新技术开发中心 [2]潞安矿务局王庄煤矿

出  处:《煤炭科学技术》1998年第12期28-31,共4页Coal Science and Technology

摘  要:经过对煤矿跨线多煤口装车线的调研,提出了一种预先亏装,过衡后按亏装量自动增补的装车工艺,并采用计控一体化技术,完成了王庄煤矿跨线多点装车线列车煤量自动增补系统开发。经测试,该系统较好地实现了列车连续、快速、高效。Abstract A coal car loading system is an very important to coal production and sales. With the development of the coal industry and requirements of the coal market economic and less person high production, Coal Mines have proposed a more higher requirement of coal car loading speed and loading accuracy. After a study and analysis of the existing coal car loading technology with multiple coal loading point and loading line, a auto balance system of coal quantity was development in combination with existing xoal loading system and electrical railway counterbalance system. With the count/control general technology, the coal cxar can have a continouus, rapid ,high efficient and accuracy loading operation. A completed such system is installed in Wangzhuang MIne of Lu'an Coal Mining Administration. After the loading test and measure, the system has reached the proposed target, a continuous rapid ,high efficient and accuracy loading operation and a loading accuracy higher than 0 3%.

关 键 词:煤炭装车 计量 自动控制 列车 增补系统 矿车 

分 类 号:TD524.2[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象