检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]宝鸡石油机械有限责任公司,陕西宝鸡721002
出 处:《电气传动自动化》2010年第2期29-32,共4页Electric Drive Automation
摘 要:论述了ZJ90/6750DB钻机自动送钻系统的设计思路和研制方法,提出了系统的工作原理、工作过程及控制方法。初步完成了该系统的工艺、硬件及软件的设计方案。特别是针对自动送钻这个时变、时滞和非线性系统及双电机送钻装置,提出了采用模糊控制方法及变频器主从控制方案,有效地解决了系统难以建立准确数学模型和双电机送钻装置的同步性及负荷均匀性等问题,在一定程度上改善了控制效果,对系统的快速性、精确性和稳定性等都有一定程度的提高。The design ideas and developing methods of oil rig auto -drilling system are demonstrated, and the working principle, working process and control method of the system are proposed. The preliminary design proposal of system technics, software and hardware is completed. The fuzzy control and frequency converter master-slave motors control are also presented on account of the time lag, time variation, nonlinearity system and double motors drilling device. The proposal solves problems effectively, such as the difficulty of establishing accurate mathe-matical model, the synchronicity of the double motors and the load uniformity. It improves the control effect, rapidity , accuracy and stability of the system.
分 类 号:TE928[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222