盾构隧道与矿山法隧道接合部施工工艺  

Construction Technique of Joint Section between Shield-driven Tunnel and Mined Tunnel

在线阅读下载全文

作  者:张二海[1] 洪健[1] 吴文涛[1] 

机构地区:[1]铁科院(北京)工程咨询有限公司,深圳518034

出  处:《非开挖技术》2010年第1期88-90,共3页China Trenchless Technology

摘  要:深圳地铁2号线蛇海区间采用盾构法+矿山法施工,但由于受地层及周边环境的限制,隧道接合部难以按原设计进行施工。经过研究比对,实际施工时采用了一种新的施工工艺,问题得以顺利解决,可供类似工程参考。Shield-driven method is adopted in the construction of She-Hai metro running of Shenzhen metro line 2 combined with mining method. Due to geological condition and restriction of surrounding environment, it's of great difficulty to follow the construction procedures of joint section between shield-driven tunnel and mined tunnel based on original design. Thus, a new alternative construction technique is adopted to solve the problem through careful study and comparison of various schedules, which could provide reference for similar projects in the future.

关 键 词:盾构隧道 矿山法隧道 接合部 施工技术 

分 类 号:U452.21[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象