地铁轨道施工常见问题及解决方案  被引量:22

Common Problems in Metro Track Construction and Their Solutions

在线阅读下载全文

作  者:刘道通[1] 杨宝峰[1] 

机构地区:[1]铁道第三勘察设计院集团有限公司,天津300251

出  处:《铁道工程学报》2010年第4期97-100,共4页Journal of Railway Engineering Society

摘  要:研究目的:轨道施工已逐渐成为制约工程总工期的关键性工程。受各种外界因素影响,提高轨道施工进度和精度显得愈来愈迫切,本文在调查研究我国城轨交通工程已建成运营线路和正在实施线路的基础上,列举地铁轨道施工最常见的几个问题,并提出相应解决方案,为保证工程质量和总工期要求提供保障。研究结论:本文详细阐述了铺轨过程中经常遇到的增设辅助铺轨基地、钢轨焊接和立柱式道床施工等具体问题,得出结论如下:(1)辅助铺轨基地应在考虑总工期要求的前提下合理设置;(2)钢轨材质不同时焊接宜采用铝热焊;(3)库内立柱式轨道应采用架轨法施工以保证施工精度。Research purposes:The metro track construction has gradually become a key step for completion of the metro construction on time.As the track construction is easily affected by various external factors,enhancing the track construction progress and precision has become more and more urgent.Based on the investigations of the completed metros and the metros under construction,this paper lists a few common problems in metro track construction,and presents the solution to them,for the purposes of assuring the construction quality and meeting the requirement of general construction schedule.Research conclusions:For the problems commonly encountered in adding assistant track laying base,rail welding and column track bed construction,it is concluded:(1) The assistant track laying base should be arranged rationally on consideration to the requirement of general construction schedule.(2) The thermal welding should be used to rails with different quality.(3) The rail racking method should be used to the column track in depot to assure the construction precision.

关 键 词:地铁轨道施工 常见问题 解决方案 

分 类 号:U231.3[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象