检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:鲁嘉 黄安芳 赵春风[1,2] 李尚飞[1,2] 张志勇
机构地区:[1]同济大学岩土及地下工程教育部重点实验室,上海200092 [2]同济大学地下建筑与工程系,上海200092 [3]广西建筑工程质量检测中心,南宁530001 [4]上海城建集团公司,上海200023
出 处:《地下空间与工程学报》2010年第2期341-347,共7页Chinese Journal of Underground Space and Engineering
基 金:上海市重点学科建设项目资助(B308);上海城建(集团)公司资助项目
摘 要:在成孔质量的各影响因素中,土层性质及成孔机具对孔径变化的影响最为显著。文章基于砂土和粘性土自身性质的差异,以及常规钻机和旋挖钻机施工特性,结合工程现场成孔实测数据,通过对不同土层条件下孔径变化趋势的统计和分析,总结出孔径变化规律。结果表明:孔径沿深度分布大致呈缩小趋势,浅部土层性质不稳,孔径变化剧烈,易受各种因素影响而产生扩孔;常规钻机护壁性能好,成孔孔径随时间变化小,相对稳定,而旋挖钻机护壁性能差,尤其在砂土中易形成缩孔;粘性土自身性质稳定,缩孔效应不明显。砂土层的粘聚力甚小,更易出现松弛,导致土体侧向位移;在砂层土采用常规钻机优势明显。在常州土层中采用旋挖钻机施工,若含有大范围砂层,建议在一清后4.5h内灌注混凝土。Soil layer character and drilling machine play the most important role among the factors which affect the quality of cavity formation. This paper makes statistics of and analyzes the trend of variation of diameter of cavities in different soil layer so as to summarize the rule and mechanism of variation of diameter of cavities by making use of measured data about diameter of cavities in engineering site. The results indicate as follows : the diameter of cavities decreases with depth increase, and the diameter of cavities in shallow soil layer change fiercely for its' quality unstable, which will make diameter of cavities expand for the disturb of soil layer due to effect of many factors; General drilling machines have good performance in shaft wall protection by drilling mud, so the diameter of cavities retains little variation with time, whereas rotary drilling machines have bad performance in shaft wall protection by drilling mud, especially in sand where they will make contractive cavities. The quality of cohesive soil is stable so that the cavities contraction is not obvious. Meanwhile, cohesive forces C of sand is little, which will produce relaxation to induce lateral displacement;General drilling machines has obvious advantages in sand, and it is advised that concrete showld be casted into cavities within 4.5h after first purging of cavities if it has a large amount of sand in Changzhou ' s soil layer in the condition of using rotary drilling machines.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112