检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:于炎鑫[1] 佴磊[1] 沈世伟[1] 丁黄平[1]
出 处:《工业建筑》2010年第5期100-103,共4页Industrial Construction
摘 要:在隧道施工中,由于前方地质情况不明,常常出现各种施工隐患及地质灾害,所以地质超前预报在施工中尤为重要。介绍TSP地质超前预报系统的基本原理、数据采集方法、数据处理与解译及其在鹰嘴岩隧道施工中的应用,并通过对预报结果、地质分析结果以及实际开挖情况的对比,说明该系统对隧道前方地质情况的预报具有准确、快速等优点,同时也总结了TSP系统的一些不足。During the tunnel construction,uncertainty of forward geological condition leads to incipient faults of construction and geological disasters.Thus,it is significantly necessary to study geologic prediction.This paper not only introduces the basic principle,data collection and data analysis of tunnel seismic prediction(TSP) system,but also presents its application to the construction of Yinzuiyan Tunnel.Through the comparisons among geological analysis,result of TSP system and the actual situation,the advantages of TSP system are proved,such as accuracy and fast prediction speed.Besides,some shortages of TSP system are summarized.
分 类 号:U452.12[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.66.142