检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]大连理工大学系统工程研究所,辽宁大连116024
出 处:《工业工程与管理》2010年第3期49-54,共6页Industrial Engineering and Management
基 金:教育部留学回国人员科研启动基金资助项目(教外司留[2005]383号文件)
摘 要:在考虑造船生产顺序约束的条件下,通过分析入、出库钢板作业及库场钢板堆垛空间的动态变化特点,建立了考虑最优入库作业计划和最少堆垛数的钢板库布局优化数学模型,并采用遗传算法求解该组合优化问题。数值例分析结果表明:该模型可给出库场作业所需的最少堆垛数以及所对应的最优入库作业计划;同时还表明:在均衡出库计划模式下可减少库场使用的堆垛数。Considering the production sequence in shipbuilding process,a layout optimization model was established to determine both the optimal input operation scheduling and the minimal steel plate blocks by analysis on the sequential features of the input and output operation scheduling on steel plate yard of shipyard.A genetic algorithm was used to solve this combinatorial optimization problem.A numerical example was illustrated,and the results show that this model can determine the least number of the yard stacks and the optimal input operation scheduling;and the number of stacks can be reduced under the equilibrium production sequence mode.
分 类 号:F253[经济管理—国民经济] O221[理学—运筹学与控制论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.214