检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨适综
机构地区:[1]中铁二局哈大客运专线项目经理部,辽宁鞍山114051
出 处:《路基工程》2010年第3期209-211,共3页Subgrade Engineering
摘 要:哈大客运专线全长904.26 km,沿线四季及昼夜温差大、冻胀作用强烈、冻融循环频繁,为使线路平顺耐久,设计轨下结构全线采用预应力CRTSⅠ型无砟轨道板。针对低温情况下轨道板的铺设工艺,目前国内外还缺乏可供借鉴的工程实践经验,文中对CRTSⅠ型无砟轨道板铺设的关键工序,特别是轨道板的精调工艺,作了比较详细的介绍。Haerbin-Dalian Passenger Dedicated Line is 904.26 km long,with large temperature difference among four seasons and,between day and night,strong frost heave and frequent cycle of freezing and thawing.For smoothness and durability of the line,prestressed CRTSⅠ type ballastless track slab shall be applied in the whole line of under-track structure.For the paving technique of track slab under low temperature,engineering practice experience lacks at home and abroad for reference at present.This paper gives detailed introduction to the key procedure,especially the fine process of paving CRTSⅠ type ballastless track slab.
分 类 号:U215.7[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28