雅砻江下游梯级水电站受电区环境效应分析  

Study on regional environmental effects of power transmission from Yalong river cascade hydropower station

在线阅读下载全文

作  者:张军良[1] 马光文[1] 王黎[1] 

机构地区:[1]四川大学水电学院,成都610065

出  处:《水力发电学报》2010年第3期23-27,共5页Journal of Hydroelectric Engineering

基  金:国家自然科学基金重点资助项目(50539140);国家科技支撑计划(2008BAB29B09)

摘  要:"川电外送"作为远距离跨区域能源合作工程,引发了区域间经济利益关系格局的重新调整,也日益突显出区域环境利益间的关系。本文结合项目工程特征,运用层次分析法建立环境效应综合评价体系,分别对受电区环境容量、区域整体竞争力、生态环境、社会环境等方面作了具体分析,结果表明清洁、优质、可靠、廉价电力资源的输入对受电区具有积极的正面效应,同时也为区域间环境补偿机制的建立提供了依据。Power transmission from Sichuan,a remote and trans-provincial energy project,has triggered the re-adjustment of economical relations,and highlighted the environmental interdependence of different regions.By adopting the data of this project,this paper makes a concrete analysis about regional environment capacity,competitivencess,eco-environment,social environment,etc.to establish a comprehensive evaluation system by means of analyztical hierarchy process(AHP).The results show that the input of power resources brings significant positive effects,which lays a foundation of compensation mechanism between regions.

关 键 词:川电外送 环境效应 AHP 雅砻江 补偿机制 

分 类 号:TV697.25[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象