检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:潘雪峰
机构地区:[1]山西省交通规划勘察设计院,山西太原030012
出 处:《筑路机械与施工机械化》2010年第2期63-66,共4页Road Machinery & Construction Mechanization
摘 要:隧道穿越软弱围岩及断层破碎带路段时,容易产生突发性地质灾害,直接威胁施工人员和设备的安全。本文结合山西省第一长隧道——宝塔山特长隧道的工程实践,介绍了隧道穿越软弱围岩及断层破碎带路段的衬砌结构设计及施工防治措施,同时着重分析了超前帷幕注浆设计及施工的关键技术,可供同类工程设计和施工参考。When tunnel traverses weak surrounding rock and fault cracked strip, it is easy to bring paroxysmal geological disaster in course of digging and it directly threatens the security of builders and equipments. For the engineering example of the first longest tunnel, the Baotashan tunnel in Shanxi province, the lining structure de- sign and construction prevention and cure measure when it traverses weak surrounding rock and fault cracked strip are introduced. Key technologies about the design and construction of advance curtain grouting are addressed, which can provide reference for analogous engineering's design and construction.
分 类 号:U452.27[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.135.64.92