大型煤化工项目煤储运系统存在的问题及整改措施  

Existing Problems and Rectifying/Reforming Measures in Coal Storage/Transport System of Large-Sized Chemical Project of Coal

在线阅读下载全文

作  者:王伟[1] 

机构地区:[1]新奥集团新能凤凰(滕州)能源有限公司,山东滕州277500

出  处:《化肥设计》2010年第3期59-61,共3页Chemical Fertilizer Design

摘  要:介绍了新奥集团新能凤凰(滕州)能源有限公司72万t/a甲醇项目煤储运系统的工艺流程;简述了煤储运系统在设计、安装调试过程中存在的问题;分析了试运行过程中出现问题的原因;提出了改变除尘器安装位置、调整环形给煤机轨道、加大皮带拍打轮直径等技术改造措施;总结了技术改造效果。Author has introduced the process flow in the coal transport and storage system of the 720 000 t/a methanol project of the Xinneng Fenghuang Energy Source Company Ltd. , Xinao Group; has briefly described the problems existed in process of design, installation and commission test for the coal storage and transport ; has analyzed the reason of the problems occurred in the running test ; has presented the technical reformation measures of changing the installation location of the de-duster, adjusting the rail way of the annular coal adding machine and enlarging the beat wheel diameter and so on; has summarized the effect of the technical reformation.

关 键 词:煤化工项目 煤储运 胶带运输机 除尘器 环形给煤机 技术改造 

分 类 号:TQ921.1[轻工技术与工程—发酵工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象