检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:许克亮[1]
机构地区:[1]中铁第四勘察设计院集团有限公司,武汉430063
出 处:《铁道建筑技术》2010年第6期27-32,共6页Railway Construction Technology
摘 要:穿城方案选择是高速铁路引入大中城市的难点。武广客运专线长沙城区段总体方案决策过程中,对桥梁、隧道方案,从工程层面对工程地质风险、方案可靠性与可实施性、工程经济性等进行了全面比较,对拆迁影响、城市土地利用、环保与城市景观协调等社会因素进行了分析论证,按总体经济最优、能经受时间检验的原则,确定采用暗线长隧道方案。浏阳河隧道工程实践说明,在地层条件适宜的条件下,采用水下隧道穿城是可行的。To select the plan to cross the city is the difficult part in introducing the high railway to large and medium sized cities. In selecting the overall plan of Shangsha section of Wu-guang passenger line, a thorough comparison was made in terms of engineering geology risk, reliability and feasibility, engineering economy. An analysis was also made in terms of displacement influence, utilization of urban area, environmental protection and urban landscape coordination. In light of the principle of economic optimization and in order to make it stand the test of time, the secret line long tunnel was finally used. The project of Liuyanghe tunnel shows that, under the suitable formation conditions, it is feasible to use underwater tunnel to cross the city.
分 类 号:U452[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3