九岭山深埋长大隧道岩爆问题预测  

On forecasting the Questions of Rock-burst in the Jiuling Shan Deep and Long Highway Tunnel

在线阅读下载全文

作  者:周龙茂[1] 龚育龄[1] 杨普济[2] 叶腾飞[1] 黎剑华[2] 

机构地区:[1]东华理工大学,江西抚州344000 [2]南昌工程学院,江西南昌330029

出  处:《东华理工大学学报(自然科学版)》2010年第2期169-172,共4页Journal of East China University of Technology(Natural Science)

摘  要:岩爆是深埋长大隧道主要的工程地质问题之一,对隧道工程的危害很大,岩爆的预测研究对于隧道的设计和施工有着重要的意义。通过对九岭山隧道初步设计及施工图设计两阶段工程地质勘察成果的研究,分析该隧道的工程地质条件、岩石力学性质及地应力测试结果,并运用现有国内外多种岩爆判别准则对其在施工期间可能发生的岩爆问题进行了预测研究。结果表明,九岭山隧道在施工期间不会出现严重的岩爆,但在埋深大于450m的洞段可能会产生低岩爆活动。Forecasting the rock-burst of the deep and long highway tunnel is helpful for tunnel design and construction,because rock-burst is harmful to tunneling engineerings and it is the one of main engineering geological problems in the deep and long highway tunnel. Two-phase engineering geological survey results of the Jiuling shan tunnel preliminary design and construction drawing design were studied. Engineering geological condition,rock mechanical properties and stress test results had been analyzed. It forecasted the rock-burst questions which may occur during the construction by using domestic and overseas varieties of rock burst criterions. The study results show that there is not serious rock-burst,but threr will be have a low rock burst activity in the depth of greater than 450m.

关 键 词:九岭山 深埋隧道 地应力 岩爆 预测 

分 类 号:U456.33[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象