检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁二院成都地勘岩土工程有限责任公司,成都610031 [2]西南石油大学电气学院,成都610500 [3]中铁二院地下铁道设计研究院,成都610031
出 处:《路基工程》2010年第4期113-115,共3页Subgrade Engineering
摘 要:针对深圳地铁2号线新建隧道邻接既有地铁隧道工程,利用FLAC3D软件进行有限元数值模拟施工力学行为研究,探讨了施工过程地层应力的变化幅度及影响范围、结构内力及结构安全性,提出了确保新建隧道施工和既有隧道运营安全的措施和建议,为隧道交叉段监控量测系统的设计、施工方案的优化及安全控制提供依据。For the newly-built tunnel construction adjacent to the existing metro tunnel in No.2 Line of Shenzhen Metro,mechanical behavior of finite element numerical simulation is studied with FLAC3D software to explore the range of variation and influence of strata stress,structural inner force and structural safety during construction,and put forward the measures and suggestions for new tunnel construction and the existing tunnel safe operation,which provides basis for monitoring system design,construction program optimization and safety control in cross section of tunnel.
关 键 词:新建隧道 邻接施工 既有隧道 力学行为 数值模拟
分 类 号:U231.3[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.16