检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:侯佑华[1] 房大中[1] 白永祥[1] 蒿峰[2] 景志滨[2] 郭抒翔[2]
机构地区:[1]天津大学电气与自动化工程学院,天津300072 [2]内蒙古电力调通中心,内蒙古呼和浩特010020
出 处:《中国电力》2010年第8期67-72,共6页Electric Power
摘 要:大规模风电入网,是当前内蒙古电网面临的主要问题之一。研究风电负荷特性对电网调度的影响,得出全网风电极小值对电网运行影响最大的结论。分析风电功率预测在电网运行管理中的作用,提出风电预测的超短期、短期和中期预测相结合的模式,用于电网调度部门的风电运行管理,降低风电对电网的冲击。说明采用电网调峰容量接纳风电,可以大幅度降低电网接纳风电的风险;并指出应按照风电跨省、跨区接纳方式,设计适用于风电运行管理的扁平化调度模式。Currently, the integrating of large-scale wind power is one of the main problems that Inner Mongolia power grid is faced with. According to the analysis of the characteristics of wind power load and their impact on dispatching, it was concluded that the greatest impact that the wind power brings to the gird operation is the theoretical minimum of the wind power in the grid. By analyzing the function of wind power forecasting in grid dispatching, a new mode of wind power forecasting was proposed, which is combined with the ultra-short-term, short term and medium term. The mode can be used in the wind power operation and dispatching, and can significantly reduce the impact of wind power to the grid. It was revealed that using power regulating capacity to accept wind power can lower the accepting risk and increase the capacity of wind power. Considering country's new energy planning, a method of the acceptance of wind power by interregional transfer and its dispatching model were proposed.
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.135.39