立井箕斗定重装载过程仿真及关闸提前量的计算  被引量:1

Simulation of Skip Weight-fixed Loading Process in Vertical Shaft and Calculation of Strobe Closing Amount in Advance

在线阅读下载全文

作  者:任中全[1] 俞涛[1] 杨剑[1] 

机构地区:[1]西安科技大学机械工程学院,西安710054

出  处:《煤矿机械》2010年第9期16-18,共3页Coal Mine Machinery

基  金:陕西省教育厅专项基金(09JK574)

摘  要:针对立井箕斗定重装载系统闸门关闭所需提前量难以设定,从而导致实际装载质量与系统设定值不一致的问题,利用Simulink软件对立井箕斗定重装载过程进行了建模与仿真,并对不同装载速度下闸门关闭所需的提前量进行了计算,有利于提高系统的装载精度,满足定重装载要求。In view of the problems, such as the skip weight-fixed loading system in vertical shaft is difficult to set the strobe closing amount in advance, the actual load weigh is different with the system setting, take use of simulink software build model and simulate the system, calculated the strobe closing amount of advance in different loading speeds, help to improve the accuracy of the loading system to meet the requirement of weight-fixed loading.

关 键 词:立井箕斗定重装载系统 提前量 仿真 SIMULINK 

分 类 号:TD531[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象