检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周小华[1]
机构地区:[1]中铁第四勘察设计院集团有限公司
出 处:《水利与建筑工程学报》2010年第4期166-168,208,共4页Journal of Water Resources and Architectural Engineering
摘 要:苏州轨道交通1号线工程的实施给苏州地区深基坑的设计与施工带来了新的课题与尝试,本文介绍了1号线地铁深基坑围护结构的设计方案,并根据1号线地铁深基坑实施过程中监测信息的反馈,总结了各种深基坑围护结构的优缺点及在本地区的适用情况;对粉性土层的分、合算原则,地基加固的选用及围护结构的入土比的规定均做出了有益的尝试,为后续工程设计提出了建议。The implementation of No. 1 line of Suzhou subway project has brought the new topic and attempt to the design and construction of deep foundation pit. Here, the design of the deep excavation bracing structure for No. 1 line of Suzhou subway project is introduced in detail. The advantages and disadvantages as welt as the application of brace structures for deep excavation in Suzhou region are summarized according to the feedback of monitoring information. At the same time, the useful attempts are made for the principle to calculate the water and earth pressures of silt soil separately and together, the selection of foundation reinforcement and the penetration ratio of brace structure, so as to put forword some suggestions for the following design of deep excavation bracing structures.
分 类 号:U231[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229