武汉天兴洲公铁两用长江大桥道碴槽板施工技术  被引量:4

Construction Techniques for Ballast Trough Slabs of Wuhan Tianxingzhou Changjiang River Rail-cum-Road Bridge

在线阅读下载全文

作  者:黄显宇[1] 贺聪[2] 

机构地区:[1]中铁大桥局集团武汉天兴洲公铁两用长江大桥建设指挥部,湖北武汉430080 [2]重庆大学,重庆401331

出  处:《桥梁建设》2010年第4期5-7,36,共4页Bridge Construction

摘  要:武汉天兴洲公铁两用长江大桥下层为两线客运专线、两线Ⅰ级货运线,铁路桥面采用道碴槽板与钢纵梁相结合的桥面结构,施工精度要求高。槽板预制采用钢模板,钢筋绑扎在胎架上一次成型,整体吊装定位,混凝土一次浇注成型;道碴槽板架设采取货运线从南向北、客运线从北向南两端相对同步架设方式,边架设,边后续结合。施工中重点控制道碴槽板的预制精度、混凝土的质量、道碴槽板的安装质量等。The lower deck of Wuhan Tianxingzhou Changjiang River Rail-cum-Road Bridge is a railway bridge arranged with two tracks of passenger dedicated lines and two tracks of Grade I freight transportation lines. The deck was designed as a structure composited with ballast trough slabs and steel stringers and the accuracy requirements for construction of the structure was stringent. The ballast trough slabs were precast with steel formwork, the reinforcement for the slabs were bound well on the jig support in one time, lifted and set in place in integrity and the concrete was cast also in one time. The slabs were installed on the deck simultaneously for the freight transportation lines from the south end towards the north end while for the passenger dedicated lines, from the north end to the south end and as the slabs were installed, the slabs and the steel stringers were made composite. In the construction process, the precast accuracy, concrete quality and installation quality of the slabs were mainly controlled.

关 键 词:斜拉桥 公路铁路两用桥 道碴槽板 架桥机 施工技术 

分 类 号:U443.312[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象