铁路客运专线明挖大断面隧道施工监测分析  被引量:6

Construction Monitoring Analysis for Large Cross-section Tunnel Excavation of Passenger Dedicated Railway

在线阅读下载全文

作  者:张明聚[1] 王诚浩[1] 吕琦[1] 叶新丰[1] 

机构地区:[1]北京工业大学城市与工程安全减灾省部共建教育部重点实验室,北京100124

出  处:《北京工业大学学报》2010年第10期1350-1356,共7页Journal of Beijing University of Technology

基  金:国家自然科学基金资助项目(50678002)

摘  要:通过对海南东环铁路美兰机场明挖隧道试验段施工跟踪监测,获得了围护结构变形与内力变化的一些规律.监测表明:1)围护结构水平位移随工期的延续而增加,基坑开挖完成后逐渐趋于稳定,最大位移值大约出现在开挖深度的三分之一处;2)锚索拉力随基坑施工工况不同而变化,基坑开挖中漏水、涌砂等情况对锚索拉力也有较大影响;3)钢支撑轴力控制标准较为严格,承载能力还有一定潜力,轴力变化平稳,略有波动.A field monitoring programme was carried out for the cut and cover railway tunnel near Meilan Airfield in Hainan province,and varied laws on deflections and internal forces of excavation retaining and protecting were obtained. There are several monitoring on clusions as follows: 1) The horizontal displacements of retaining structure increases with the construction duration and tends to be stable gradually after the foundation pit excavation is completed. The largest displacement appears on about one third depth of the excavation. 2) The axial force of cables changes greatly during the excacation of the foundation pit,and sand and water effuse quickly between high-pressure rotating piles,which has great influence on the axial force of cables. 3) The steel supports adoptes strict control standards and has some potential bearing capacity. The axial force of steel support changes steadily and fluctuates very little.

关 键 词:明挖隧道 锚索拉力 围护桩变形 钢支撑轴力 施工监测 

分 类 号:TU921[建筑科学—建筑设计及理论]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象