检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河南理工大学能源科学与工程学院,河南焦作454003 [2]义煤集团跃进煤矿,河南义马472300
出 处:《煤炭工程》2010年第11期77-80,共4页Coal Engineering
摘 要:水体下安全采煤问题是煤矿企业面临的技术难题之一。针对郑煤集团芦沟煤矿32采区的煤层覆存、地质构造、水文地质、采煤方法等具体地质采矿条件及地表五星水库的现状,在计算防水安全煤岩柱尺寸的基础上,结合地表移动和变形预计,对五星水库下开采的安全性进行了分析。经过计算分析认为:五星水库下进行煤层全采是安全可行的。目前,首采的32101工作面采后是安全的,从而验证了此计算分析是科学、可靠的。The issue of the safety mining under the water body is one of the technical problems faced to the coal mine enterprises.According to the seam deposit,geological structure,hydrology,mining method and the certain geological and mining conditions as well as the surface Five Star Reservoir status,base on the calculation of the size for the water prevention safety coal and rock pillars,in combination of the predictions of the surface ground movement and deformation,an analysis on the safety of the coal mining under the Five Star reservoir was conducted.After the calculation and analysis,it held that a full seam mining under the Five Star Reservoir would be safety and feasible.At present,the first coal mining face-No.32101 coal mining face was safety after the face mining completed,which could be verified that the calculation and analysis was scientific and reliable.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.175