检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河海大学水利水电工程学院,江苏南京210098 [2]河海大学水资源高效利用与工程安全国家工程研究中心,江苏南京210098
出 处:《水力发电》2010年第3期55-58,共4页Water Power
基 金:国家自然科学基金项目(50809025);国家科技支撑计划课题(2006BAC14B03)
摘 要:根据坝体及坝基的变形特性,对位移水压分量进行分离,建立大坝多测点位移场的混合模型,反演得到坝体及坝基的综合弹性模量,并根据此反演结果,利用结构分析法拟定坝顶水平位移的监控指标。以棉花滩大坝为例进行计算,采用结构分析法的拟定结果与采用实测资料小概率法的拟定结果非常接近,说明反演分析结果反映了工程实际情况。Based on dam body and foundation deformation characteristics,the water press component of displacement was separated and the hybrid model for dam multi-measuring point displacement field was established.The back analysis on comprehensive elastic modulus of body and foundation was conducted by this hybrid model,and based on the results of back analysis,the monitor indicators of crest horizontal displacement was developed by using structural analysis method.As an example,this model was applied on the study of Mianhuatan Dam,and the results are very close to the results formulated by small probability method based on actual measured data.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.154