严寒地区高速铁路CA砂浆的性能要求与防冻措施  被引量:2

Performance Requirement and Anti-freezing Measures of CA Mortar for High-speed Railway in Severe Cold Area

在线阅读下载全文

作  者:杨适综 

机构地区:[1]中铁二局哈大项目经理部,辽宁鞍山114051

出  处:《路基工程》2010年第6期178-181,共4页Subgrade Engineering

摘  要:针对严寒地区高速铁路轨道板铺设工艺的关键工序——CA砂浆的灌注,介绍了CA砂浆的性能要求、提高抗冻性的措施、搅拌工艺和低温灌注的控制要点。通过现场试验段验证,CA砂浆的一般指标和特殊指标均符合严寒地区水泥沥青砂浆补充性能要求。但严寒地区施工应重点控制搅拌机转速和搅拌时间,并避开在大雪或气温骤降时进行作业,施工及养护期间均应加强保温措施。For CA mortar grouting,the key procedure of track slab laying process of high speed railway in severe cold area,performance requirement,anti-freezing measures,mixing technology and control points of low temperature grouting of CA mortar are introduced in this paper.Through verification of site test section,the general index and special index of CA mortar meet the additional performance requirement of cement asphalt mortar in severe cold area.But for construction in severe cold area,mixer rotating speed and mixing time shall be the key control points.Operation shall be avoided in heavy snow and temperature sudden drop.Insulation measures shall be strengthened during construction and maintenance.

关 键 词:严寒地区 CA砂浆 灌注工艺 控制 

分 类 号:U415.6[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象