检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]黑龙江省航务勘察设计院,哈尔滨150001 [2]交通部天津水运工程科学研究所工程泥沙交通行业重点实验室,天津300456
出 处:《水道港口》2010年第6期604-608,共5页Journal of Waterway and Harbor
摘 要:采用正态物理模型对依兰航电枢纽下坝线施工一期春汛围堰、主围堰及施工二期通航水流条件进行试验研究。经过多方案比较,提出了经济合理的施工期通航工程措施。结果表明:施工一期春汛围堰、主围堰均壅高了上游水位,同时改变了水流流速分布。施工二期船闸及整治工程建成后,船闸试通航期上下游引航道口门区及连接段通航水流条件基本满足要求,洪水期仅下游连接段纵向水流流速偏大。Based on normal physical model test,the spring flood cofferdam and main cofferdam in phase I of Yilan Navigation Power Junction and the navigation flow condition in phaseⅡwere studied.After comparison of many schemes,the economic and reasonable navigation measure during the construction period was proposed.The results show that upstream water level is generally raised up by the spring flood cofferdam and the main cofferdam in phase I of the junction,and the distribution of velocity is also changed.After completion of ship lock and regulation project,navigation flow conditions at the entrance of upper and lower approach channels and the connecting section during the trial navigation period can basically meet the requirement.During flood period,only the longitudinal flow velocity at the downstream connection section is too large.
分 类 号:TV551[水利工程—水利水电工程] U611[交通运输工程—船舶及航道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117