穿越既有线暗挖地铁隧道施工支护结构内力监测及分析  被引量:5

Support Structure Internal Force Monitoring and Analysis for Undercut Metro Tunnel in Crossing the Existing Line

在线阅读下载全文

作  者:张明聚[1] 牛大伟[1] 

机构地区:[1]北京工业大学城市与工程安全减灾省部共建教育部重点实验室,北京100124

出  处:《北京工业大学学报》2010年第12期1624-1630,共7页Journal of Beijing University of Technology

基  金:国家自然科学基金项目资助(50678002)

摘  要:针对北京地铁4#线西单站暗挖隧道工程,制定了支护结构内力监测方案.通过钢拱架轴力的监控量测,掌握施工过程中初期支护结构内力状态的动态变化以及对隧道变形和结构稳定性的影响并及时反馈,为判断隧道安全稳定提供了参考数据.The ground surface settlement and deformation of existing tunnels of subway stations undercut with shallow overburden have important effects on the construction safety.This paper introduces the processes of tunnel excavating of the Xidan station of Beijing subway line 4 Xidan station.A scheme for monitoring structural forces is drawn up.The trends of structural forces and rock pressure are under control,and the reference information is provided to judge the stability and safety of the tunnel by monitoring information feedbacks.

关 键 词:浅埋暗挖 地铁车站 穿越 监控量测 信息反馈 

分 类 号:TU94[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象