黑麋峰抽水蓄能电站长斜井滑模及灌浆施工新技术  被引量:3

Slipform and Grounting for the Long Inclined Shaft Construction of Heimifeng Pumped-storage Power Station

在线阅读下载全文

作  者:劳俭翁 

机构地区:[1]中国水利水电第十二工程局有限公司,浙江杭州310004

出  处:《水力发电》2011年第2期34-37,共4页Water Power

摘  要:黑麋峰抽水蓄能电站引水斜井长449.054m,直线段长392.427m,倾角50°,混凝土衬砌后洞径8.5m,设计衬砌厚度0.5~0.8m。斜井衬砌混凝土采用LSD斜井滑模系统连续不间断施工,通过对先进技术的集成和创新,安全、高效、保质、保量地完成了施工任务,取得了十分满意的效果。The length of diversion inclined shaft in Heimifeng Pumped-storage Power Station is 449.054 m, the diameter after lining is 8.5 m and the lining thickness is 0.5-0.8 m. The length of straight line section of shaft is 392.427 m and the inclination angle is 50 degree. Based on tile integration and innovation of advanced construction technologies, the LSD inclined-shaft slipform system was used for the continuous construction of concrete lining. The practice shows the security, efficiency and quality of construction is satisfactory.

关 键 词:长斜井 混凝土衬砌 滑模 安全设施 灌浆新技术 黑麋峰抽水蓄能电站 

分 类 号:TV743[水利工程—水利水电工程] TV732.3

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象