检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西南石油大学土木工程与建筑学院,成都610500 [2]中国石油大学石油工程教育部重点实验室,北京102249
出 处:《岩土力学》2011年第4期1229-1233,共5页Rock and Soil Mechanics
基 金:国家自然科学基金(No.50874082)
摘 要:根据隧道工程施工实际情况和地下水渗流的基本规律,以及弹塑性力学理论,建立了在应力场和渗流场耦合作用下隧道开挖数学模型,借助Comsol模拟了隧道开挖过程中围岩应力场及渗流场的变化规律。研究结果表明:在原岩开挖时,隧道围岩变形及地面沉降大,不利于周围建筑的安全,隧道内积水,施工无法进行;进行灌浆处理后,围岩变形小,地面沉降得到控制,有利于施工及周围建筑的安全。According to the execution situation of the tunnel project, the theory of elastoplastic mechanics and the seepage law of groundwater are taken into account; a mathematical model considering seepage-stress coupling of the tunnel is established; seepage and the stress field around the tunnel in different working states are simulated by applying Comsol. The results indicate that during the process of excavation without any measures, deformation of the soil around the tunnel occurs; the deformation of the rock and the settlement of the ground are large; the buildings nearby are in danger and the groundwater infiltrates into the tunnel; the project can't be conducted; after grouting, the deformation of the rock around the tunnel is reduced and the settlement of the ground is controlled; then the buildings nearby are safe and the tunnel excavation can be processed safely.
分 类 号:U451[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249