六盘山隧道1号斜井与正洞交叉口段施工技术  被引量:2

Construction Technology of NO.1 Inclined Shaft and Crossings in Liupan Mountains

在线阅读下载全文

作  者:穆秀明 

机构地区:[1]兰州铁道设计院有限公司,甘肃兰州730000

出  处:《科技创新与生产力》2011年第4期94-96,共3页Sci-tech Innovation and Productivity

基  金:陕西省科学基金项目(009JQ7004);陕西省教育厅基础研究项目(09JK538)

摘  要:新建天平铁路六盘山隧道进口为双线隧道,隧道开挖断面大、工期紧,为加快施工进度,选择合理的斜井转正洞施工方法具有重要的意义。介绍了由小断面进入大段面施工的直接一次切入法,结合六盘山隧道进口斜井进入正洞交叉口段施工为工程背景,对小断面斜井进入正洞施工的施工技术进行了详细探讨。New Balance railway tunnel is the two-lane tunnel in Liupan Mountains,which has the features of a large section and the tunnel excavation,tight schedule.In order to speed up the construction schedule,selecting a reasonable method of tunnel construction shaft regularization of has great significance.In this paper,the author introduced plunge methods from light section to big one.Combining background of construction technology of NO.1 inclined shaft and crossings in Liupan Mountains,the author expounded construction technology from light section to big one.

关 键 词:隧道工程 交叉口 施工技术 

分 类 号:U455[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象