检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:罗宏伟[1]
机构地区:[1]中铁第四勘察设计院集团有限公司线站处,武汉430063
出 处:《武汉理工大学学报(交通科学与工程版)》2011年第2期431-434,共4页Journal of Wuhan University of Technology(Transportation Science & Engineering)
摘 要:上海枢纽因沪宁城际高速铁路的引入而发生改建工程,各改建工程交叉干扰,既有京沪、沪昆繁忙干线仍在运营,为此提出对枢纽内工程实施的5大步骤.Shanghai railway terminal is rebuilded for the introduction of Shanghai-Nanjing inter-city high-speed railway.The reconstruction project cross interference,both the Beijing-Shanghai,Shanghai-Kunming busy trunk is still in operation,therefore the paper put forward on the project within the project implementation of the five steps.For similar inter-city railway high-speed passenger dedicated line introduction to large railway terminal caused by rebuilding project formulating the guiding construction organization scheme has certain reference function.
分 类 号:U238[交通运输工程—道路与铁道工程] U291.1
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.135.220.9