检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《公路》2011年第5期12-15,共4页Highway
基 金:河南省基础与前沿技术研究计划项目资助;项目编号102300410171
摘 要:应力路径就是指土体受力发生、发展和变化的过程。在采用传统路堤稳定计算方法分析的基础上,基于应力路径的基本概念和太沙基破坏模式确定应力路径分析法中关键点的选取原则,并在饱和深厚软土条件下通过该点的有效应力和超孔隙水压力的转化关系反演得到后处理施工先填方高度的一个简化计算公式。Stress path refers to the process of occurrence,development and change of soil force.Through the analysis of traditional method of embankment stability,the principle of selecting of key points in the stress path analysis method is determined on the basis of the basic concepts of stress-path and sabotage model of Terzaghi,the pre-filling height of post-processing technology is obtained by counterdeduce the relationship between effective stress and pore water pressure of the point of saturated soft soil groundwork,a calculation formula of pre-filling height is given for the convenient application of engineering
关 键 词:道路工程 稳定性分析 应力路径 后处理技术 先填土高度
分 类 号:U416.1[交通运输工程—道路与铁道工程] TU433[建筑科学—岩土工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28