330MW机组给水泵改造经济性分析  被引量:11

Economical Efficiency of Feedwater Pump Upgrading of 330 MW Unit

在线阅读下载全文

作  者:安欣[1] 赵晖[1] 骆贵兵[1] 廖军林[1] 刘国弼[1] 吕庆文[2] 

机构地区:[1]西安热工研究院有限公司,陕西西安710032 [2]华能淮阴电厂,江苏淮安223001

出  处:《能源技术经济》2011年第4期15-18,共4页Electric Power Technologic Economics

摘  要:介绍了华能淮阴电厂330 MW机组电动给水泵改造为汽动给水泵的特点,根据改造后机组在日常调峰范围内不同运行方式下的参数,对改造后的经济性进行了计算,得到机组负荷投资收益表,继而根据该厂实际情况计算了机组投资回收年限,并从机组剩余寿命角度出发对改造的经济性进行了分析,给同类型机组汽动给水泵改造的可行性分析提供借鉴。This paper introduces the characteristics of replacement of the motorized feedwater pump with the steam turbine-driven feedwater pump in a 330 MW unit. Calculation of the economical efficiency of the renovation is conducted according to the different operation parameters within the load range of operation to obtain the return sheet of the investment in the unit capacity, and then the number of years of investment return is calculated based upon the actual operation conditions of the power plant. The economical efficiency of the upgrading is also analyzed in the light of the remaining service years of the unit. The studies in this paper provide reference for the feasibility study of the feedwater pump renovation for similar units.

关 键 词:330 MW机组 汽动给水泵 经济性 投资回收期 

分 类 号:TK223.52[动力工程及工程热物理—动力机械及工程] F270.3[经济管理—企业管理]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象