高速铁路客运专线存梁台座沉降计算分析  被引量:3

Settlement Calculation of Deposit Beam Pedestal for Passenger Dedicated Line of High-speed Railway

在线阅读下载全文

作  者:戴必辉[1] 喻泽红[1] 王松[1] 

机构地区:[1]长沙理工大学水利学院,长沙410076

出  处:《路基工程》2011年第3期41-44,共4页Subgrade Engineering

基  金:湖南省科技计划项目(2007FJ4188)

摘  要:结合哈大铁路客运专线某900 t箱梁预制梁场的工程概况及工程地质勘探资料,对已投入使用的存梁台座进行沉降计算研究,分析台座的工作机理,通过比较不同的计算方法及其计算结果,并与实测沉降数据对比,找到了适合台座沉降计算的方法及参数取值,获得了存梁台座支点沉降及不均匀沉降的发展规律,为台座设计和沉降控制提供指导和依据。Combined with the engineering situation of 900 t precast box beam field of Harbin-Dalian passenger dedicated line and geological exploration data,the settlement of deposit beam pedestals that have been put into operation is studied and the working mechanism of pedestal is analyzed.By comparing different calculation results from different methods with the settlement data,the appropriate method of settlement calculation and parameters are determined,and the developmental law of pedestal support settlement and uneven settlement is obtained,which can provide guidance and theoretical basis for pedestal design and settlement control.

关 键 词:客运专线 存梁台座 压缩模量 沉降计算分析 

分 类 号:TU433[建筑科学—岩土工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象