检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁二院工程集团有限责任公司,成都610031
出 处:《路基工程》2011年第3期243-246,共4页Subgrade Engineering
摘 要:国道317线K9滑坡为大型牵引式滑坡,经2003年、2004年多次整治后,2005年又发生变形,再次进行勘察设计和综合整治。通过滑坡成因的分析,设计中充分利用既有抗滑桩工程,并采用滑坡上部埋式抗滑桩、中部锚索框架梁或锚索板、前缘抗滑桩及深层排水等综合工程治理,有效地保证了滑坡的稳定,并经受了"5.12"汶川大地震的考验。K9 landslide in National Highway No.317 Line is the large-scale retrogressive landslide.It became deformed again in 2005 after several treatment in 2003 and 2004,which requires a second survey and comprehensive treatment.Through analyzing the cause of landslide,taking full use of the existing anti-slide pile engineering in design,the upper embedded anti-slide pile,middle anchor cable frame beam or anchor-cable plate,front anti-slide pile and drainage measures are adopted to effectively ensure the stability of landslide.After comprehensive treatment,the landslide withstood 5.12 Wenchuan Earthquake.
分 类 号:U416.163[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117