检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]辽宁工程技术大学土木建筑工程学院,阜新123000
出 处:《世界科技研究与发展》2011年第3期425-427,共3页World Sci-Tech R&D
摘 要:根据支特向量机优越的非线性拟合性能,建立变形量的时间序列预测模型,滚动预测围岩变形量,提高了预测模型的训练速度和预测推广能力。该方法用于西乡-固戍盾构段围岩变形预测,并与BP神经网络预测进行比较。结果表明这种模型可预测区间较长且具有较高的准确度,能够科学地指导现场施工和监测。According to the powerful capacity of the support vector machine in non-linear modeling, the time serial forecast model is estab-lished to predict rock deformation continuously. The training and the predictive ability of the forecast model is promoted. The method is used in Xixiang-Gushu Shield segment to predict the rock deformation. Compared with BP neural network, the results show that a longer range and higher accuracy forecast interval can be predicted. So the site construction and monitoring can be guided scientifically by this model.
分 类 号:U456.31[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40